h1

Inside Chernobyl Nuclear Power Plant 2011, Part II: Deaerator Corridor and Unit 1 Control Room » P1020053

West end of the Unit 1 Main Control Room, as seen from the shift supervisor’s desk. “A” Desk is the left most desk, containing controls for the reactor. Behind it are the core map display linked to the “SKALA” computer (left) and the servo display that indicates core insertion of control rods, movable instrumentation, startup sources, etc. Part of “P” Desk (the pump operator’s desk) can be seen at the right side of the screen. A lit CRT behind this desk shows work ongoing in the Central Hall (the reactor fueling face).


Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s