h1

Inside Chernobyl Nuclear Power Plant 2011, Part II: Deaerator Corridor and Unit 1 Control Room » P1020058

A westward view of the Unit 1 control room from the perspective of the reactor operator at “A” Desk. The next console is “P” Desk (the pump operator’s console), followed by “T” Desk (the turbine operator’s console). Note the liberal use of wood paneling.


Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s