h1

Inside Chernobyl Nuclear Power Plant 2011, Part I: Unit 3 and V Block » P1020117a

Looking to the west in the Unit 3 south main circulation pump engine hall, Room 402/1, toward the side connected with the ventilation block. The heavy doors in the floor lead to a compartment for cleaning contaminated items. In the background are some large devices that I don’t know about.


Leave a comment