h1

Chernobyl Unit 2, November 2016 (Part 2) » dscf5423_v1

Controls for the No. 1 automatic power regulator on A Desk (reactor control engineer's position) in Unit 2 at Chernobyl.

Controls for the No. 1 automatic power regulator on A Desk (reactor control engineer’s position) in Unit 2 at Chernobyl. This computerized regulator was one of two that were typically engaged under full-power routine operation.

Controls for the No. 1 automatic power regulator on A Desk (reactor control engineer’s position) in Unit 2 at Chernobyl.


Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s