h1

Inside Chernobyl Nuclear Power Plant 2011, Part II: Deaerator Corridor and Unit 1 Control Room » P1020051

A piping and instrumentation diagram tacked to the wall in the Unit 1 Main Control Room. This diagram deals with a specific water treatment system I think.


Leave a comment