Inside Chernobyl Nuclear Power Plant 2011, Part IV: Switchyard Control Room » P1020088

The view upon entering the switchyard control room from the gold deaerator corridor. The chief of the electrical section has a desk at center, surrounded by control racks. The racks control the power plant’s supply transformers and Diesel generators, 110-kV transmission circuits, 330-kV transmission circuits, and 750-kV transmission circuits.