h1

Inside Chernobyl Nuclear Power Plant 2011, Part IV: Switchyard Control Room

August 11, 2011

Its reactors have been out of service for years, but Chernobyl Nuclear Power Plant’s vast electrical switchyard still buzzes with some of the highest voltages on the European continent.  It’s a distribution hub that channels hundreds of megawatts generated at other plants to consumers in northern Ukraine and southern Belarus.  The bustling control room for the switchyard is sited between the Unit 1 and Unit 2 reactors along the deaerator corridor.  The men who work there not only control the flow of juice to parts distant, but also are responsible for maintaining the power plant’s grid connection and backup Diesel generators: power is essential for cooling thousands of spent fuel assemblies.

Click any photo below for a larger version with my description; click again for a full-size file.

For this summer’s other photos from ChNPP, see Part I, Part II, and Part III.

To compare and contrast facilities at Chernobyl with those at an operational RBMK-1000 plant, please see this recent photodiary featuring the Kursk NPP (the 14th photo shows one of the switchyard control rooms there).

One comment

  1. Great post, I really liked the images. You helped me a lot with them!



Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: