h1

Inside Chernobyl Nuclear Power Plant 2011, Part II: Deaerator Corridor and Unit 1 Control Room » P1020055

Controls on “P” Desk, where the pump operator sits. We have no idea how this system was supposed to function. If anyone has access to an RBMK-1000 training text or operations manual, I would love to see it.


Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s